I-24 (WBL) over CSX RAILROAD (340588K)

6.2 MI NE OF NEW ENGLAND · County 083, Georgia · Built 1966 · 2 Lanes · 50,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000008300450
Year Built
1966
Length
57.6 m (189 ft)
Max Span
20.1 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
50,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$738,000
Total Project Cost
$1,108,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.