US 80 SR 22 over ECHECONNEE CREEK

10 MI NE OF ROBERTA · County 079, Georgia · Built 1928 · 2 Lanes · 3,870 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000007900110
Year Built
1928
Reconstructed
1959
Length
78 m (255.9 ft)
Max Span
15.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
3,870
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.