SR 54 over SHOAL CREEK

4.4 MI N OF TURIN · County 077, Georgia · Built 2024 · 2 Lanes · 12,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000007751950
Year Built
2024
Length
57.9 m (190 ft)
Max Span
41.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
12,200
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,872,000
Total Project Cost
$25,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.