SR 34 BYPASS over S-1422 WELCOME ALL ROAD

2.7 MI NW OF NEWNAN · County 077, Georgia · Built 1988 · 2 Lanes · 8,110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000007700870
Year Built
1988
Length
43.3 m (142.1 ft)
Max Span
21.9 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
8,110
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$555,000
Total Project Cost
$832,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.