L. FAYETTEVILLE RD over I-85

2.5 MI E OF NEWNAN · County 077, Georgia · Built 1970 · 2 Lanes · 15,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000007700520
Year Built
1970
Length
91.1 m (298.9 ft)
Max Span
27.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
15,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,168,000
Total Project Cost
$1,752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.