SR 232 over WALTON BRANCH
4 MI NE OF GROVETOWN · County 073, Georgia · Built 2014 · 2 Lanes · 14,700 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.505958, -82.181617
This bridge is in worse condition than 48.5% of bridges in County 073. The average bridge in Georgia is 0 years old; this one is 12 years old.
Nearby Bridges
SR 232 over CRAWFORD CREEK
Built 2006
HEREFORD FARM ROAD over TUDOR BRANCH
Built 1960
LEWISTON ROAD over I-20
Built 2009
SR 232 over UCHEE CREEK
Built 1982
CHAMBLIN ROAD over I-20
Built 1966
SAWMILL TRAIL over MILL BRANCH
Built 2006
CHAMBLIN ROAD over UCHEE CREEK
Built 1984
I-20 (WBL) over UCHEE CREEK
Built 1966
I-20 (EBL) over UCHEE CREEK
Built 1966
SIR GALAHAD DRIVE over BETTYS BRANCH TRIB.
Built 1960
Bridge Details
- Structure #
- 000000007350260
- Year Built
- 2014
- Length
- 27.4 m (89.9 ft)
- Max Span
- 27.4 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 14,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,208,000
- Total Project Cost
- $12,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.