BELAIR ROAD over I-20

1.7 MI S OF SR-232 · County 073, Georgia · Built 1964 · 6 Lanes · 38,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000007300350
Year Built
1964
Reconstructed
1993
Length
76.5 m (251 ft)
Max Span
21.6 m
Width
29.9 m (98.1 ft)
Lanes
6
Daily Traffic
38,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,051,000
Total Project Cost
$3,076,000