HURST ROAD over BIG BRANCH

APP 4.4 MI NW OF FUNSTON · County 071, Georgia · Built 1965 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000007151470
Year Built
1965
Length
15.2 m (49.9 ft)
Max Span
3 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
158
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$50,000
Total Project Cost
$194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.