JR SUBER ROAD over WARRIOR CREEK TRIB

APP 5.2 MI SE NORMAN PARK · County 071, Georgia · Built 1975 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000007150640
Year Built
1975
Length
9.1 m (29.9 ft)
Max Span
3 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
158
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$41,000
Total Project Cost
$181,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.