SR 135 over INDIAN CREEK

APP 3.5 MI S OF DOUGLAS · County 069, Georgia · Built 2005 · 2 Lanes · 7,140 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000006950570
Year Built
2005
Length
65.2 m (213.9 ft)
Max Span
18.3 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
7,140
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$836,000
Total Project Cost
$1,254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.