SAND HILL CHURCH R over OTTER CREEK

5 MI E OF DOUGLAS · County 069, Georgia · Built 1982 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006950370
Year Built
1982
Reconstructed
2000
Length
24.7 m (81 ft)
Max Span
6.1 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$316,000
Total Project Cost
$475,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.