JOWERS CHURCH RD over 29 MILE CREEK
4.6 MI SE OF DOUGLAS · County 069, Georgia · Built 1978 · 2 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.407539, -82.748294
This bridge is in worse condition than 54% of bridges in County 069. The average bridge in Georgia is 0 years old; this one is 48 years old.
Nearby Bridges
OLD AXSON ROAD over 29 MILE CREEK
Built 1975
BAKER HIGHWAY over CAT CREEK TRIB.
Built 1959
SR 64 over SMUT BRANCH
Built 1974
BAKER HIGHWAY over CAT CREEK
Built 1950
BAKER HIGHWAY over CAT CREEK TRIB.
Built 1950
AXSON HIGHWAY over CAT CREEK
Built 1959
SR 158 over 17 MILE RIVER
Built 2014
BAKER HIGHWAY over CAT CREEK TRIB.
Built 1950
GREEN ACRE ROAD over SATILLA RIVER TRIB.
Built 1976
SR 64 over 17 MILE RIVER
Built 2016
Bridge Details
- Structure #
- 000000006950020
- Year Built
- 1978
- Length
- 29.6 m (97.1 ft)
- Max Span
- 6.1 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $379,000
- Total Project Cost
- $568,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.