FLYING HAWK ROAD over DRY CREEK

APP 3 MI S OF NICHOLLS · County 069, Georgia · Built 1970 · 2 Lanes · 420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006900610
Year Built
1970
Length
54.9 m (180.1 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
420
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.