SR 206 over CSX RAILROAD

IN WEST DOUGLAS · County 069, Georgia · Built 1962 · 4 Lanes · 13,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000006900570
Year Built
1962
Reconstructed
2001
Length
40.5 m (132.9 ft)
Max Span
13.7 m
Width
26.2 m (86 ft)
Lanes
4
Daily Traffic
13,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$803,000
Total Project Cost
$1,205,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.