McRAE HIGHWAY over CULLEY CREEK
APP 12 MI NE OF BROXTON · County 069, Georgia · Built 1980 · 2 Lanes · 530 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.761536, -82.936703
This bridge is in worse condition than 54% of bridges in County 069. The average bridge in Georgia is 0 years old; this one is 46 years old.
Nearby Bridges
McRAE HIGHWAY over PAUL CREEK
Built 1980
US 441 / SR 31 over CULLEY CREEK
Built 1935
US 441 SR 31 over MILL CREEK
Built 2004
US 441 - US 319 - over OCMULGEE RIVER OVERFLOW
Built 1987
US 441 - US 319 - over OCMULGEE RIVER OVERFLOW
Built 1987
US 441 - US 319 - over OCMULGEE RIVER
Built 1987
SR 117 over LAMPHIN BRANCH
Built 1947
US 319/ SR 31 over GREGEORY CREEK
Built 1987
McRAE HIGHWAY over ROCKY CREEK
Built 1980
SR 117 over DOPSON BRANCH
Built 1949
Bridge Details
- Structure #
- 000000006900230
- Year Built
- 1980
- Length
- 43.3 m (142.1 ft)
- Max Span
- 6.1 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 530
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $555,000
- Total Project Cost
- $832,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.