SR 360 over POWDER SPRINGS CREEK

3.8 MI NW OF POWDER SPR · County 067, Georgia · Built 2022 · 2 Lanes · 15,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006753760
Year Built
2022
Length
45.7 m (149.9 ft)
Max Span
27.4 m
Width
26.2 m (86 ft)
Lanes
2
Daily Traffic
15,600
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,320,000
Total Project Cost
$19,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.