I-75 OFF RAMP over I-75 MANAGED LANES

2.7 MILES NORTH EAST OF S · County 067, Georgia · Built 2018 · 2 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006753370
Year Built
2018
Length
44.5 m (146 ft)
Max Span
44.5 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,965,000
Total Project Cost
$19,447,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.