CONCORD ROAD over SILVER COMET TRAIL

2.5 MILES SOUTH WEST OF S · County 067, Georgia · Built 2009 · 1 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006752710
Year Built
2009
Length
19.8 m (65 ft)
Max Span
19.8 m
Width
5.4 m (17.7 ft)
Lanes
1
Daily Traffic
2,047
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$185,000
Total Project Cost
$277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.