EWING ROAD over SILVER COMET TRAIL

2.9 MILES NORTH OF AUSTEL · County 067, Georgia · Built 1999 · 2 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000006752160
Year Built
1999
Length
43.6 m (143 ft)
Max Span
22.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,047
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$559,000
Total Project Cost
$838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.