US 278 / SR 6 over POWDER SPRINGS CREEK

1.5 MILES EAST OF PAULDIN · County 067, Georgia · Built 1985 · 5 Lanes · 40,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006701890
Year Built
1985
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
26 m (85.3 ft)
Lanes
5
Daily Traffic
40,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,137,000
Total Project Cost
$1,705,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.