I-20 over CHATTAHOOCHEE RIVER

6.2 MI SE OF AUSTELL · County 067, Georgia · Built 1963 · 8 Lanes · 153,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006700900
Year Built
1963
Reconstructed
1979
Length
137.8 m (452.1 ft)
Max Span
33.2 m
Width
41.8 m (137.1 ft)
Lanes
8
Daily Traffic
153,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,656,000
Total Project Cost
$6,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.