US 78 over CHATTAHOOCHEE RIVER

6.1 MI S OF SMYRNA · County 067, Georgia · Built 1934 · 4 Lanes · 26,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006700340
Year Built
1934
Reconstructed
1985
Length
164.6 m (540 ft)
Max Span
30.5 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
26,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,261,000
Total Project Cost
$4,891,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.