US 41/ SR 3 over SR 280
IN SE MARIETTA · County 067, Georgia · Built 1956 · 4 Lanes · 29,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.922386, -84.505133
This bridge is in worse condition than 90.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 70 years old.
Nearby Bridges
RMP US 41 TO 280 S over SR 280
Built 1967
US 41/ SR 3 over ROTTENWOOD CREEK
Built 1936
FRANKLIN ROAD over ROTTENWOOD CREEK
Built 1968
I-75 MANAGED LANES over ROTTENWOOD CREEK
Built 2017
I-75 over ROTTENWOOD CREEK
Built 1965
I-75 MANAGED LANES over S. MARIETTA PKWY RAMP
Built 2017
BARCLAY ROAD over ROTTENWOOD CREEK
Built 1961
I-75 MANAGED LANES over SR 280 DELK ROAD
Built 2017
SR 280 over I-75 - I-75 RAMP
Built 1965
US 41/ SR 3 over POORHOUSE CREEK
Built 1936
Bridge Details
- Structure #
- 000000006700130
- Year Built
- 1956
- Length
- 49.4 m (162.1 ft)
- Max Span
- 13.1 m
- Width
- 23.4 m (76.8 ft)
- Lanes
- 4
- Daily Traffic
- 29,700
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $978,000
- Total Project Cost
- $1,467,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.