SR 94 over CYPRESS CREEK

APP 2.2 MI E OF FARGO · County 065, Georgia · Built 1989 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006500600
Year Built
1989
Length
158.5 m (520 ft)
Max Span
12.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,032,000
Total Project Cost
$3,048,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.