SR 331 (EBL) over I-75 AND (1) RAMP

1 MI S OF I-285 · County 063, Georgia · Built 1959 · 3 Lanes · 25,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300280
Year Built
1959
Length
76.2 m (250 ft)
Max Span
20.7 m
Width
14 m (45.9 ft)
Lanes
3
Daily Traffic
25,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.