I-575 (SBL) over LITTLE RIVER

2.2 MI N OF WOODSTOCK · County 057, Georgia · Built 1982 · 2 Lanes · 26,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005700450
Year Built
1982
Length
135.6 m (444.9 ft)
Max Span
27.1 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
26,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,739,000
Total Project Cost
$2,608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.