Feldspar Drive over CR 975 SW BYPASS

3.3 Miles on Veterans Pkw · County 051, Georgia · Built 2022 · 4 Lanes · 8,515 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000005151350
Year Built
2022
Length
79.2 m (259.8 ft)
Max Span
39.6 m
Width
30.2 m (99.1 ft)
Lanes
4
Daily Traffic
8,515
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$23,088,000
Total Project Cost
$34,632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.