I-95 (SR405) over I-16 (SR 404)
I-16 I-95 INTERSECTION · County 051, Georgia · Built 2022 · 2 Lanes · 7,640 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.075444, -81.247589
This bridge is in worse condition than 12.7% of bridges in County 051. The average bridge in Georgia is 0 years old; this one is 4 years old.
Nearby Bridges
I-16 (SR 404) over I-95 (SR405)
Built 2022
I-95 over I-16 (SR 404)
Built 2022
I-16 over HARDIN CANAL
Built 1966
PINE BARREN over I-95 (SR 405)
Built 1975
RODGERS ST. over HARDEN CANAL
Built 1960
POOLER PARKWAY over I-16 (SR 404 )
Built 2000
QUACCO ROAD over I-95 (SR 405)
Built 1969
PINE MEADOW DRIVE over OGEECHEE CANAL TRIB
Built 2004
I-95 (NBL) over NS RAILROAD
Built 1975
I-95 (SBL) over NS RAILROAD
Built 1975
Bridge Details
- Structure #
- 000000005151220
- Year Built
- 2022
- Length
- 454.2 m (1490.2 ft)
- Max Span
- 35.1 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 7,640
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $132,312,000
- Total Project Cost
- $198,468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.