SR00307 over Port Authority Railroad

1.6 MILES SOUTH OF PORT W · County 051, Georgia · Built 2012 · 4 Lanes · 14,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005150810
Year Built
2012
Length
289.3 m (949.1 ft)
Max Span
36 m
Width
24.2 m (79.4 ft)
Lanes
4
Daily Traffic
14,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,730,000
Total Project Cost
$8,596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.