SALLIE MOOD DR. over CASEY CANAL

1 MI S OF HUNTER AIR FIEL · County 051, Georgia · Built 1959 · 2 Lanes · 1,706 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005150180
Year Built
1959
Length
18.3 m (60 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,706
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.