US 80 SR 26 over WILMINGTON RIVER
4 MI SE OF SAVANNAH · County 051, Georgia · Built 1987 · 5 Lanes · 28,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.033886, -81.047922
This bridge is in worse condition than 18.3% of bridges in County 051. The average bridge in Georgia is 0 years old; this one is 39 years old.
Nearby Bridges
US 80 over GRAY CREEK
Built 1959
H.S.TRUMAN PKWY over SR 26 (US 80)
Built 1993
US 80 over CASEY CANAL
Built 1993
52ND STREET over M-4036 52ND STREET
Built 1992
TRUMAN PKWY over CS 677 ANDERSON ST
Built 1997
TRUMAN PKY OFF RP/ over CASEY CANAL
Built 1993
DELESSOPS DRIVE over CASEY CANAL
Built 1991
TRUMAN PKWY over M-4048 HENRY ST
Built 1997
TRUMAN PKY ON RP/S over CASEY CANAL
Built 1993
REUBEN CLARK ST. over CASEY CANAL
Built 1991
Bridge Details
- Structure #
- 000000005101630
- Year Built
- 1987
- Length
- 666.6 m (2187 ft)
- Max Span
- 45.7 m
- Width
- 23.1 m (75.8 ft)
- Lanes
- 5
- Daily Traffic
- 28,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,536,000
- Total Project Cost
- $23,305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.