ATWOOD STREET over EAST CHIPPEWA

0.25 MI S OF SR 204P (SAV · County 051, Georgia · Built 1973 · 2 Lanes · 4,795 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005101480
Year Built
1973
Length
13.7 m (44.9 ft)
Max Span
7.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
4,795
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$176,000
Total Project Cost
$264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.