I-516 (SBL) over SR 25 CONN BAY STREET

IN SAVANNAH CITY LIMITS · County 051, Georgia · Built 1972 · 3 Lanes · 39,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005100190
Year Built
1972
Length
80.5 m (264.1 ft)
Max Span
24.4 m
Width
15.4 m (50.5 ft)
Lanes
3
Daily Traffic
39,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,313,000
Total Project Cost
$1,969,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.