HOUSTON VALLEY RD over DRY CREEK

5.3 MI SE OF RINGGOLD · County 047, Georgia · Built 2020 · 2 Lanes · 400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000004750600
Year Built
2020
Length
45.7 m (149.9 ft)
Max Span
16.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$13,320,000
Total Project Cost
$19,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.