TYUS VEAL ROAD over BECK CREEK

6 MI S OF BOWDON · County 045, Georgia · Built 2019 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000004551690
Year Built
2019
Length
23.8 m (78.1 ft)
Max Span
23.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
330
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$6,956,000
Total Project Cost
$10,434,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.