BUFFALO CREEK ROAD over BUFFALO CREEK
3.5 MI SW OF CARROLLTON · County 045, Georgia · Built 1960 · 2 Lanes · 300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
33.540481, -85.108647
This bridge is in worse condition than 89.9% of bridges in County 045. The average bridge in Georgia is 0 years old; this one is 66 years old.
Nearby Bridges
MARTIN-CEMETERY RD over BUFFALO CREEK
Built 1960
LAUREL ROAD over BUFFALO CREEK
Built 2011
SR 166 over BUFFALO CREEK
Built 1979
HAYS MILL ROAD over BUFFALO CREEK
Built 1948
STADIUM DRIVE over BUFFALO CREEK
Built 2017
NORTH ALLISON ROAD over BUFFALO CREEK
Built 2010
US 27 over SR 166 (US 27 ALT)
Built 2013
ROOP STREET over BUFFALO CREEK
Built 2013
US 27 over BUFFALO CREEK
Built 1960
DIXIE STREET over BUFFALO CREEK
Built 1950
Bridge Details
- Structure #
- 000000004550060
- Year Built
- 1960
- Length
- 21.6 m (70.9 ft)
- Max Span
- 7.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $277,000
- Total Project Cost
- $416,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.