HORSELY MILL ROAD over SR 166 SOUTH BYPASS

2 MI E OF CARROLLTON · County 045, Georgia · Built 1977 · 2 Lanes · 8,506 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000004500720
Year Built
1977
Length
90.2 m (295.9 ft)
Max Span
27.4 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
8,506
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,157,000
Total Project Cost
$1,735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.