SR 113 over I-20

1.5 MI S OF TEMPLE · County 045, Georgia · Built 1976 · 2 Lanes · 20,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000004500400
Year Built
1976
Length
96.3 m (315.9 ft)
Max Span
31.1 m
Width
19 m (62.3 ft)
Lanes
2
Daily Traffic
20,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,235,000
Total Project Cost
$1,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.