SR 61 NBL over I-20

IN W VILLA RICA · County 045, Georgia · Built 1976 · 2 Lanes · 35,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000004500330
Year Built
1976
Length
99.7 m (327.1 ft)
Max Span
30.8 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
35,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,278,000
Total Project Cost
$1,916,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.