US 27 over L. TALLAPOOSA RIVER TRIB

3 MI N OF CARROLLTON · County 045, Georgia · Built 1937 · 6 Lanes · 13,600 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000004500050
Year Built
1937
Reconstructed
1991
Length
7.3 m (24 ft)
Max Span
2.1 m
Lanes
6
Daily Traffic
13,600
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$196,000
Total Project Cost
$294,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.