I-16 WBL over FIFTEEN MILE CREEK

2.6 MI SE OF METTER · County 043, Georgia · Built 1977 · 2 Lanes · 22,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000004300250
Year Built
1977
Length
121.9 m (399.9 ft)
Max Span
12.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
22,900
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,563,000
Total Project Cost
$2,344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.