COLERAIN-ST. MARYS over I-95 (SR 405)

1.5 MI NE OF KINGLAND · County 039, Georgia · Built 2018 · 4 Lanes · 11,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000003950660
Year Built
2018
Length
89.3 m (293 ft)
Max Span
30.2 m
Width
29.6 m (97.1 ft)
Lanes
4
Daily Traffic
11,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,018,000
Total Project Cost
$39,027,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.