N RIVER CAUSWAY DR over NORTH RIVER

5 MI NE OF ST MARYS · County 039, Georgia · Built 2002 · 2 Lanes · 3,110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000003950510
Year Built
2002
Length
79.2 m (259.8 ft)
Max Span
13.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,110
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,016,000
Total Project Cost
$1,524,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.