BREWSTER AVENUE over DUNN BRANCH

CITY LIMIT OF WOODBINE · County 039, Georgia · Built 1995 · 2 Lanes · 370 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003950470
Year Built
1995
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
370
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.