I-95 (NBL) over WALKER SWAMP

7.5 MI N OF KINGSLAND · County 039, Georgia · Built 1972 · 3 Lanes · 64,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003900360
Year Built
1972
Reconstructed
1999
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
24.3 m (79.7 ft)
Lanes
3
Daily Traffic
64,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$448,000
Total Project Cost
$671,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.