ADAMS ROAD over NEALS CREEK

APP 3 MI SW OF DICKEY · County 037, Georgia · Built 1963 · 2 Lanes · 120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000003750090
Year Built
1963
Length
32.9 m (107.9 ft)
Max Span
8.2 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$422,000
Total Project Cost
$633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.