SR 16 over OCMULGEE RIVER

BUTTS-JASPER CO. LINE · County 035, Georgia · Built 2006 · 2 Lanes · 4,850 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003550500
Year Built
2006
Length
237.7 m (779.9 ft)
Max Span
39.6 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
4,850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,048,000
Total Project Cost
$4,571,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.