US 25 NBL over BRIER CREEK OVERFLOW

4.7 MI N OF WAYNESBORO · County 033, Georgia · Built 2008 · 2 Lanes · 14,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000003350500
Year Built
2008
Length
60 m (196.9 ft)
Max Span
11.9 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
14,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$770,000
Total Project Cost
$1,155,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.