THOMPSON BR ROAD over BRIER CREEK OVERFLOW

8.1 MI E OF WAYNESBORO · County 033, Georgia · Built 1959 · 2 Lanes · 1,520 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003300500
Year Built
1959
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,520
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.