MP MARTIN ROAD over CROSS BRANCH
9.7 MI SE OF BROOKLET · County 031, Georgia · Built 1981 · 2 Lanes · 158 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.271392, -81.558247
This bridge is in worse condition than 47.5% of bridges in County 031. The average bridge in Georgia is 0 years old; this one is 45 years old.
Nearby Bridges
OLD SR 46 over ASH BRANCH
Built 1956
MUD ROAD over CROSS BRANCH
Built 1975
MUD ROAD over IRIC CREEK
Built 1975
I-16 WBL over ASH BRANCH
Built 1974
I-16 EBL over ASH BRANCH
Built 1974
US 80 / SR 26 over CROSS BRANCH
Built 1932
US 80 / SR 26 over CANEY BRANCH
Built 2020
SR 119 CONNECTOR over POLE BRANCH
Built 1974
GOV-TREUTLEN HWY over I-16 (SR 404)
Built 1974
ARCOLA ROAD over UPPER BLACK CREEK
Built 2021
Bridge Details
- Structure #
- 000000003150260
- Year Built
- 1981
- Length
- 13.7 m (44.9 ft)
- Max Span
- 4.6 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 158
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $176,000
- Total Project Cost
- $264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.